2nd Shift Press Operator
Manufacturing / Logistics
Owensboro Kentucky Apr 4, 2024
Entry-Level Manufacturing 
Monday - Friday 
3:30pm - Midnight (overtime may be required at times)
Steel-toed boots or shoes are required 

Position consists of one-hour training/badging at their Philpot plant at 2pm. Upon finishing, candidate will leave there, same day, and report to the plant they'll be working at, to finish their day. Every day thereafter, candidate only reports to the Tamarack Rd location/plant. 

This position is a Temporary to Permanent position. With proven attendance and performance, client can extend an offer of full-time to candidate after 90 calendar days.